The client had a new tenant that required a higher power supply than what was currently available at their switchboard. The existing switchboard was in really poor shape so we convinced them the only option was a full upgrade. This was a tough job as there was very little room in the existing riser. Working with NRP switchboards we were able to create a design for the switchboard and riser box to fit the space. As with most commercial properties shutting down through the day is not really and option. We carried out 3 shut down over 3 weekend evenings to carry out the works without any issues. The client was stoked and the tenant had the new switchboard with upgraded power supply ready before he opened.